Le test comprend 80 questions aléatoires.
Total de questions sur ce sujet : 147
Which of the options represents the best action to take when an item of machinery, which normally operates in automatic mode, is operated in “manual” mode?
Keep the Chief Engineer informed of machines performance on an hourly basis.
Have someone permanently stationed at the machine in case of an operational problem.
Monitor the operation of the machinery on a frequent basis.
Change over all other machinery to manual mode of operation.
A section of seawater pipe has been removed for maintenance. When refitting the pipe after completing the work the bolt holes in the flanges are found to be misaligned. What procedure should be followed to finish the work?
Adjacent pipework should be slackened off to allow the pipe to be aligned. Any incorrectly positioned brackets should be adjusted after the pipe is refitted.
Use a chain block to pull the pipe flanges into alignment and leave it in place after the bolts are fitted to avoid overstressing the bolts.
Use wooden wedges to force and hold the pipe into the correct position and then fit the bolts.
Force the pipe into position and then hammer the bolts into the holes to hold the pipe flanges into alignment.
Modern slow speed, two stroke diesel engines often have locating pins or pegs to keep the piston rings in a fixed position. Why is this arrangement used?
The piston ring gaps can be kept in line to control the gas pressure on each of the rings.
The piston rings are more difficult to lubricate because of the slow operating speeds and will wear more quickly if they are allowed to rotate.
It avoids the risk of the ends of the piston rings being forced out by the gas pressure and catching on the scavenge ports.
It ensures the rings cannot be mixed up and that they are fitted in the correct order on the piston.
After main power is restored (following a blackout), a timed sequential restart of motor driven auxiliaries is necessary to avoid:
Generator overload due to many motors starting at simultaneously.
Overvoltage due to current surges.
Overloading creating earth faults.
Over-frequency due to overspeed of generator.
Why is it important to check the timing of diesel engine cylinder oil lubricators?
To ensure the piston is not covering the lubrication points and blocking the flow of cylinder lubricating oil into the cylinder.
To ensure cylinder lubricating oil enters the cylinders when the piston is in the required position.
To ensure the correct amount of cylinder lubricating oil is fed into the cylinders.
To avoid excess pressure in the cylinder lubrication system.
What is the expansion ratio of the foam produced by the fixed low-expansion foam fire-extinguishing system of an engine room?
Greater than 20 to 1 but less than 50 to 1.
What is the period of validity of the Safety Management Certificate?
What is the purpose of the ODME (Oil Discharge Monitoring Equipment) printer?
To prove that oil has been pumped overboard according to regulations.
To prove fault conditions in the ODME.
To prove that the ODME system has been used.
What is the correct name of the part highlighted in the illustration?
An electrical power emergency source in a ship is required because:
It satisfies the SOLAS requirements for ship safety.
The main diesel generator(s) can be taken out of service for overhaul or repair.
It satisfies the need to be environmentally “friendly”.
The ships total load can be shared between main and emergency generators.
What precautions should be taken, in addition to shutting the main air start valve if work is to be carried out inside the main diesel engine crankcase?
Keep a man posted in the control room to stop anyone who tries to start the engine.
Engage the turning gear and put a notice at each engine control position.
Engage the turning gear, stop the starting air compressors and drain the air receivers.
Engage the turning gear and close every valve on the starting air receivers.
If a refrigeration system contains air, how would you remove it from the system?
Pump the system down to the evaporator and keep the fan running until the evaporator is at ambient temperature and vent off the air from the top of the evaporator.
Stop the compressor and vent the air from the crankcase.
Pump the system down to the condenser, continue cooling water flow until the condenser is at the same temperature as the cooling water and vent off the air from the top of the condenser.
Stop the compressor and undo a pipe coupling at the highest point in the system to vent off the air.
What is generally considered as the minimum safe time period before opening a crankcase door after the oil mist detector alarm has activated and the engine has been stopped?
After at least 20 minutes.
After at least 5 minutes.
After at least 10 minutes.
What is meant by the term “feel over sequence” as applied to diesel engine operation following replacement of a crankshaft bearing?
Stopping the engine to check the bearing temperature after a short period of operation and repeating this procedure at increasing running intervals.
Running the engine at low load and gradually increasing the load over a period of 12 hours.
Stop the engine after 2 hours running to check the bearing temperature by running the hand over it.
What do you understand by the order: “Move the pilot ladder to the other side?”
Move the pilot ladder to the other side, means: to move the pilot ladder further along nearer to the bow.
Move the pilot ladder to the other side, means: to rig another pilot ladder.
Move the pilot ladder to the other side, means: to change the position of the pilot ladder from the main deck to the fore deck.
Move the pilot ladder to the other side, means: to shift the pilot ladder to the opposite side of the ship.
What is the correct name of the tool shown in the illustration?
Thermistors are temperature sensitive devices. A positive temperature coefficient thermistor will typically have:
Relatively linear characteristic.
Relatively non linear characteristic.
An earth fault exists on the blue line of a 100 A bilge pump circuit. A second earth fault occurs on the yellow line of a 10 A ventilation fan circuit. The likely outcome is that:
Both motors trip out on overload.
A short circuit occurs between earth faults and the ventilation fan fuse blows.
A short circuit occurs between earth fault and the bilge pump fuse blows.
An open circuit occurs between earth fault and both motors trip out.
In a purifier assuming the separating temperature is correct, what is the probable cause of the processed oil containing water?
The back pressure at the clean oil outlet is too high.
The gravity disc is too small and/or the flow rate is too high.
The throughput is too low.
The gravity is too large.
For ideal synchronising as the incomer circuit breaker contacts make, the phase angle difference between the incomer e. m. f. and the busbar voltage should be:
On finding a person apparently unconscious in a High Voltage switch room, which of the following should be done?
Raise alarm then drag the victim clear so that they cannot reach live parts while receiving aid.
Check if the victim is in contact with live parts and if not apply first aid.
Raise alarm, identify means of isolation and apply before approaching victim.
Trip all breakers and approach victim.
What does the term “Dead Ship” mean?
“Dead Ship” means that the ship cannot make way through the water.
“Dead Ship” means that the ship is aground.
“Dead Ship” means that the machinery and boilers are inoperational due to lack of electrical power.
“Dead Ship” means that auxiliary machinery is not operational.
Is it necessary to cool the samples taken from a diesel engine cooling water system before carrying out tests to determine the concentration of treatment chemicals?
No, the test should be carried out at system temperature.
Yes, the samples should be cooled to approximately 25 °C.
Yes, the samples should be cooled to approximately 50 °C.
No, the samples should be heated to approximately 95 °C.
What will be the probable outcome if the amplification is set too high on a controller?
The process will oscillate and get out of control.
The set-point will change.
The process response will be very slow.
A detector that is activated by a rise of temperature is:
For a Nitrite – Borate based cooling water treatment system, what would be considered to be the normal nitrite concentration limits for a correctly dosed system?
3 000 – 4 500 ppm Nitrite.
1 500 – 3 000 ppm Nitrite.
4 500 – 6 000 ppm Nitrite.
The exhaust gas temperatures of all cylinders of a diesel engine are seen to be high. Select, from the options given, the most likely cause of this:
Insufficient cooling of the main bearings.
High wear rate in one of the fuel injection pumps.
One of the fuel cams is worn.
In a diesel engine lubrication system the circulating pump normally takes suction from the oil sump tank. Where would the oil normally pass to directly after the pump?
The responsibility for safety and security rests with everybody on board the vessel. General house-keeping rules should be followed. Which of the listed rules is the most important?
Do not carry lighters or matches when working outdoors.
Always use gloves when using grinding machines.
Keep tools within easy reach during work.
Keep your working area clean and tidy.
A flame detector is activated by:
Smoke, gas, sparks and high temperature.
The radiation of heat given off by flames.
The rise of the environment temperature.
The infrared radiation and ultraviolet radiation given off by flames.
What is the disadvantage of using chemicals on an oil-spill on the water?
It is difficult to apply the chemicals if the oil drifts away from the ship’s side.
The chemicals make it difficult to remove the oil from the water.
It is difficult to apply chemicals if there is any wind.
The water gets a white colour, which makes it easy to detect the oil-spill.
During maintenance work on a main diesel engine the fuel injection valve is found to be jammed in the pocket in the cylinder cover. Which of the procedures given in the options should be followed in order to complete the work?
Wedge a bar between the piston top and the bottom of the injector and use the turning gear to force the injection valve out.
Replace the complete cylinder cover with a spare unit and land the cover with the jammed valve ashore for repair in a specialist workshop.
Remove the cylinder cover and try and drive the injection valve out of the pocket from the underside with a hammer and punch.
With the fuel injection valve retaining nuts removed admit compressed air into the engine cylinder to try and blow the injection valve out of the pocket.
What is the main advantage of having a central cooling system fitted on board ship?
It should require less maintenance than a conventional system using only sea water.
It is a simple system with minimum control requirements.
It does not require any seawater.
Only one heat exchanger is needed for all cooling duties.
A vapour compression refrigiration system is usually fitted with a number of devices to give protection and control of the system. Which of the methods given in the options should be used to test the high pressure cut out during routine maintenance and checking of the system?
Manually close each of the evaporator coils by switching off the electrical supply to the liquid line solenoid shut off valves and monitor the condenser pressure.
Close the condenser outlet valve and closely monitor the condenser pressure.
Gradually shut in the condenser cooling water valve or the condenser refrigerant inlet valve while closely monitoring the compressor discharge pressure.
Charge the system with refrigerant until the high pressure cut out operates.
What effect does an increased oil feed flow rate have on the performance of a centrifuge operating as a purifier?
Separating efficiency is unchanged.
Separating efficiency is increased, more water is removed.
Separating efficiency is increased, more solids are removed.
Separating efficiency is reduced.
What is the correct name of the part highlighted in the illustration?
Which of the following instruments is normally part of a control-loop?
What is the correct name of the tool shown in the illustration?
What action should be taken by the engine room rating if a piece of machinery is not functioning properly?
If machinery does not function properly, the Chief Engineer should be called out immediately.
If machinery does not function properly, it should be immediately stopped every time.
If machinery does not function properly the duty Engineer should be informed immediately so that plans for further action can be made.
If machinery does not function properly, it should be stopped and serviced immediately.
In a low pressure auxiliary boiler, what would be considered to be the maximum allowable chloride level of the boiler water?
During maintenance of a pneumatically operated, diaphragm actuated control valve the diaphragm is found to be split. Select, from the options given, a suitable material to use to make a temporary replacement if there is no spare diaphragm available.
Natural rubber sheet of approximately the same thickness and elasticity as the original diaphragm material.
Cotton reinforced rubber insertion sheet of smaller thickness but similar strength as the original diaphragm material.
Natural rubber sheet of greater thickness and lower elasticity as the original diaphragm material.
Cotton reinforced rubber insertion sheet of approximately the same thickness but less elasticity than the original diaphragm material.
What function is this operational amplifier circuit performing?
What do you understand by: “Let go the port anchor?”
Let go the port anchor means: slacken the port anchor cable.
Let go the port anchor means: put the port windlass brake in gear.
Let go the port anchor means: put the port windlass brake in gear and lower the anchor.
Let go the port anchor means: open the port windlass brake.
B Class divisions in ships are constructed so that they are capable of preventing the passage of flame to the end of a standard fire test held for:
For two generators running in parallel, their share of additional load (kW) will be determined by the:
Voltage droop setting on each AVR.
Governor droop settings on each prime mover.
The temperature difference between the generator rotors.
The power factor of the additional load.
During maintenance work on a compensated mechanical hydraulic governor air is drawn in to the hydraulic circuit after draining and flushing out the unit. Which of the actions given in the options is most likely to assist in the removal of the air from the system?
With the governor in operation open the compensation needle valve to introduce instability and disturb the engine load to make the governor hunt.
Overfill the governor with fresh oil to force all of the air out.
Drain the governor again and slowly refill with fresh oil.
With the governor in operation close the compensation needle valve and disturb the load to make the engine hunt.
A ship has a medium speed engine and a controllable pitch propeller propulsion system. What would the propeller pitch normally have to be at to allow starting of the engine?
Under which circumstances should a sprinkler head of a common fixed sprinkler fire-extinguishing system be activated?
When the smoke density exceeds 12,5 % obscuration per minute, but after the corresponding alarm is acknowledged and assessed at the control panel.
When the temperature is within a range from 68 °C to 79 °C, but after the corresponding alarm is acknowledged and assessed at the control panel.
Automatically, when the temperature is within a range from 68 °C to 79 °C.
Automatically, when the smoke density exceeds 12,5 % obscuration per meter.
While alongside at a repair berth a new section of seawater pipe has been fabricated in a shoreside workshop from drawings supplied by the vessel. During fitting of the pipe by ship’s engineers it is noted that the pipe is too short leaving a gap of about 8 mm between the flange faces. What action should be taken to remedy this problem?
The pipe should be returned to the shoreside workshop for modification or to be remade to the correct dimensions.
The ships engineer’s should use extra long bolts and pull the flanges together.
The ship’s engineers should fit extra thick joints between the flanges to fill the gap.
The ship’s engineers should manufacture a spacer piece to fit the gap.
What is the correct name of the tool shown in the illustration?
As part of the regular maintenance for a paramagnetic oxygen analyser used for measuring the oxygen content of exhaust gas it is important to keep the sample line filter as clean as possible. Why is this necessary with this type of instrument?
The filter may rupture due to the high pressures generated by the sample pump.
Pressure variations in the sample chamber can cause errors so restrictions must be kept to a minimum.
The pressure drop across the filter may damage the sampling pump.
A high flow rate is required in order to deflect the sensing element.
The correct time to synchronise is usually taken to be when the synchroscope reaches the “5 to 12” position and is rotating slowly clockwise. This to allow for:
Generator phase difference error.
Circuit breaker operating time.
Synchroscope pointer time lag.
What is the correct name of the tool shown in the illustration?
What is the most important task after carrying out any major overhaul on a diesel engine?
Start the auxiliary blower to ventilate the engine so that it has sufficient fresh air for starting.
Start the engine to check the direction of rotation.
A thorough check inside the engine to make sure all tools and cleaning rags have been removed.
Repair any damaged paint work on the engine.
When a fire breaks out in the accommodation, cargo holds or on deck, who is in charge of the fire fighting operations?
The first officer arriving at the scene.
The first person arriving at the scene.
The person who is designated in the muster list.
The lubricating oil in the bearing housing at the turbine end of a turbocharger gets very dirty after only a few hours in service. What is the most likely reason for this happening?
The wrong type of lubricating oil has been used.
Damaged rotor shaft sealing bushes allowing exhaust gas to leak into the bearing housing.
The turbine end bearing is badly worn.
The lubricating oil filling connection screw cap is missing.
When a ships derrick or crane lifts a weight off the deck of a ship, from which position can the centre of gravity of the weight be considered to act?
From the centre of the weight lifted.
From the position on the deck from which the weight was lifted.
From a position on the deck at the base of the derrick or crane.
From the head of the derrick or crane.
It is common practice to connect a resistor over an alarm contact (see diagram) in many applications. Why is this connection used?
To monitor the cable/wires for break.
To stabilise power consumption.
To avoid sparks on the contacts when opening and closing.
Enable measuring the total resistance of the circuit.
What is the best method to use to remove heavy scale and fouling from the plates of a heat exchanger?
Use high-pressure cleaner with abrasive additives.
Soak the plates in recommended cleaning solution and then use a soft brush or pressure cleaner.
Use wire-brush metal scrapers and chipping guns.
PT-100 sensors are some times used with 3 or 4 wires. What is the reason for this?
Higher mechanical strength of the cable.
Because of power-consumption.
Higher measuring accuracy.
A large electric motor is being removed from a main seawater pump with the aid of the engine room crane. Which is the best method of starting the lift from the options given?
Use the full hoist facility on the crane to “break” the motor free after slackening all of the retaining bolts.
Use the “inch up” facility on the crane to “break” the motor free after slackening all of the retaining bolts.
Use a suitable chain block suspended from the crane hook to “break” the motor free after slackening all of the retaining bolts.
Use the full hoist facility to lift the motor clear in one action after removing all of the retaining bolts.
Which of the following is not a principle of heat transfer utilised in an oil fired steam boiler?
During an unmanned period on a UMS vessel the “low water level” alarm for the jacket cooling water system expansion tank activates. What action would you take as duty engineer?
Answer the alarm then block the alarm and change to manned engine room condition.
Answer the alarm then block the alarm function for later action and resume unmanned operation.
Answer the alarm and adjust the alarm set point for the water level in the expansion tank before resuming unmanned operation.
Answer the alarm, top up the tank and check the system for leakage before resuming unmanned operation.
The circuit consists of two inductors, L(1) = 6 H and L(2) = 12 H, connected in parallel. Calculate the equivalent L(S) of the two inductors.
For ideal synchronising as the incomer circuit breaker contacts make, the phase angle difference between the incomer e. m. f. and the busbar voltage should be:
What type of construction material should be avoided regarding fire protection purposes? (SOLAS II-2/2.2.3).
All combustible materials.
All uncovered wooden materials.
What is likely to be the cause of black smoke from a diesel engine exhaust seen at the funnel?
Engine is burning some lubricating oil.
Incomplete combustion of the fuel.
When you are calibrating an instrument what is the most common second step in the procedure?
Adjustment of Zero-point.
Why is it important to check the timing of diesel engine cylinder oil lubricators?
To ensure the piston is not covering the lubrication points and blocking the flow of cylinder lubricating oil into the cylinder.
To ensure the correct amount of cylinder lubricating oil is fed into the cylinders.
To ensure cylinder lubricating oil enters the cylinders when the piston is in the required position.
To avoid excess pressure in the cylinder lubrication system.
An auxiliary engine is fitted with a duplex type lubricating oil filter. The in-use element requires changing. What procedure should be used to fit the new element?
With the engine running, position the changeover cock so that both filters are in use to reduce the pressure before.
With the engine running, shut off the filter inlet and quickly fit the new element.
The engine must be stopped to fit a clean filter element.
With the engine running, change over to the other filter after priming it and replace the dirty element after checking there is no pressure on dirty filter housing.
What is the correct name of the part highlighted in the illustration?
What do you understand by: Bitter end?
Bitter end means: the end link of an anchor cable that is secured within the chain locker.
Bitter end means: a foul taste at the end of a meal.
Bitter end means: to the very last moment.
Bitter end means: the toggled end of a lifeboat painter.
What is one of the main features of the cylinder lubricating oil used in large 2 stroke marine diesel engines which normally operate on heavy fuel oil?
It is neutral with a pH value of 7.
It is a pure mineral oil without any special additives.
It is recommended that every prospective seafarer should, before being employed in a sea-going ship, receive proper training in personal survival techniques. In respect of such training several recommendations are made. Answer the question: “To whom should training in personal survival techniques be given?”
The two instruments necessary for generator synchonising are:
kW meter and frequency meter.
Voltmeter and synchroscope.
Synchroscope and kVar-meter.
Amp-meter and volt-meter.
What type of component does this graphical symbol illustrate?
Pressure-reducing regulator.
What is the main reason for keeping engine lubricating oil viscosity within recommended limits?
To reduce system pressure losses.
To ensure the strength of the oil film is sufficient to keep lubricated surfaces apart.
To neutralise any acids that may form.
Before leaving the machinery spaces of a UMS vessel after routine watchkeeping rounds in the evening, the duty engineer inspects the doors to Fuel Oil Treatment rooms which are covered by a fixed fire fighting installation. For what purpose does he do this?
To tie them open with a rope to prevent the heat from building up inside, and making it uncomfortable to work.
Remove the auto closing device so they remain in whatever position.
Wedge them open with an arrangement which allows them to be closed quickly in the event of a fire.
To make sure that they are properly closed with the self closing device so that any fire is contained and the extinguishing medium can be released without delay.
When you join a new ship, how are you informed about safety rules, alarm instructions and your own duties in case of an emergency?
By folder distributed to each crewmember.
By muster list exhibited in conspicuous places.
By alarm instructions in all crew cabins.
By oral instructions by the Captain.
You are starting to get low on water in the lifeboat. What should you do?
Mix sea water with 50 % fresh water.